LAX TERMINALS 2 & 3 MODERNIZATION PROJECT

The Terminals 2 and 3 Modernization Project plays an integral role in LAWA’s efforts to modernize the north terminals. Approximately 830,000 square feet of new building space would be added to the two terminals. The proposed project would provide additional space balanced with passenger demand for ticketing, passenger and baggage check-in, and security screening. The proposed project would ease congestion and provide enhanced connectivity between the two terminals – both within the ticketing and check-in portion as well as post-security screening and would enable increased operational flexibility and efficiency, including the potential relocation of Delta Air Lines to Terminals 2 and 3 from their current location at Terminals 5 and 6.



Proposed Project Elements 

  • Upgrading the Terminal 2 concourse
  • Demolition and reconstruction of the Terminal 3 concourse building
  • Demolition of the southern appendages of the Terminal 3 satellite (oval shaped structure at the north end of Terminal 3)
  • Demolition and reconstruction of the passenger and baggage processing facilities (ticketing buildings) at Terminals 2 and 3.

LAX Specific Plan Compliance Review Process:

Prior to issuing any grading, building or use of land permit on the a proposed Project, the Los Angeles City Council must grant an LAX Plan Compliance approval pursuant to the LAX Specific Plan. This approval will be based on recommendations from LAWA’s Executive Director and the Board of Airport Commissioners. The Executive Director’s recommendation will be included in the Executive Director’s Report.

Executive Director's Report (EDR) 

Environmental Documents

California Environmental Quality Act (CEQA)


Draft Environmental Impact Report

A Draft EIR assessing the potential impacts of the LAX T2 and T3 Modernization Project has been prepared and is available for public review and comment. LAWA will accept comments on the Draft EIR until 5:00 p.m., April 10, 2017.

Draft Environmental Impact Report Files

Public Scoping Meeting (08/24/2016) – Boards & Fact Sheet

Boards - PDF Download
Fact Sheet - PDF Download

Draft EIR Public Meeting (3/21/17) - Boards and Fact Sheet

Boards - PDF Download
Fact Sheet - PDF Download

Final Environmental Impact Report
              Final Environmental Impact Report Files

  • Shute, Mihaly & Weinberger LLP on behalf of the City of El Segundo comment letter attachments - Exhibits A through O

A) Southern California Association of Governments 2040 Regional Transportation Plan / Sustainable Communities Strategy, Aviation Appendix
B) El Segundo's April 6, 2017 Request under the California Public Records Act
C) El Segundo's November 15, 2016 Comments on the LAX Landside Access Modernization Program ("LAMP") DEIR
D) El Segundo's March 1, 2017 Comments on the LAMP FEIR
E) CEQA documents for LAX Specific Plan Amendment Study
F) CEQA documents for LAX Master Plan
G) Delta Lease Materials
H) Selected news articles re Delta lease and Terminals 2 and 3 expansion project
I) Report of Dr. Adib Kanafani, Ph.D., NAE
J) 2014 Annual Progress Report, LAX Master Plan Mitigation Monitoring & Reporting Program
K) Final LAX Noise Exposure Map Report (August 2015)
L) Letter from N. Liddicoat, MRO Engineers, to L. Impett, March 29, 2017
M) "Report: LAX Traffic Could be Getting a Whole Lot Worse," E. Chiland, Curbed Los Angeles, March 10, 2016
N) "Construction at LaGuardia Airport Causing Gridlock, Traffic Nightmares," J. Einiger, ABC News, August 23, 2016
O) LAMP DEIR and FEIR

              Final EIR Addendum

Back To Top