Project Documents


CEQA Documents

Notice of Preparation/ Initial Study - PDF Download

A Notice of Preparation is a document stating that an Environmental Impact Report will be prepared for the project. It is the first step in the CEQA environmental review process. LAWA has determined that an Environmental Impact Report needs to be prepared for the Airfield & Terminal Modernization Project.

An Initial Study is a preliminary analysis conducted to determine if an Environmental Impact Report must be prepared and to identify areas of environmental effects to be analyzed in the EIR. LAWA has prepared an Initial Study identifying the potential environmental effects of the Airfield & Terminal Modernization Project.



Other Documents

Scoping Meetings Mailer- PDF Download                            
Fact Sheet - PDF Download                            
Final Scoping Meeting Boards - PDF Download
Visual Simulation of Proposed Roadway #1- To the LAX Central Terminal Area from northbound Sepulveda Blvd.
Visual Simulation of Proposed Roadway #2-
From the LAX Central Terminal Area to Sepulveda Blvd.
Visual Simulation of Proposed Roadway #3-
To the LAX Central Terminal Area from southbound Sepulveda Blvd.



  Click to sign up for alert   Click to request a meeting
 
Back To Top