LINXS Construction Advisory


STEEL ERECTION BEGINS AT LAX’S MIDFIELD SATELLITE CONCOURSE SOUTH CONSTRUCTION SITE

closure map

Activity:

To facilitate the installation of structural framework for LAX's Midfield Satellite Concourse (MSC) South, crews are conducting construction activities at the project's site located south of Westchester Pkwy. To ensure minimal community disruption, the below impact mitigation measures will be in place throughout the project's construction.


 

Community Impact Mitigation Measures:

  • Use of watering trucks and street sweepers to reduce dust;
  • Adherence to Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan;
  • Noise monitoring and adherence to noise ordinance guidelines;
  • Occasionally, trucks will be required to enter and exit the construction site, and traffic control measures will be used to safely direct drivers and minimize traffic disruptions during these times. Travelers shall obey all flaggers and posted signage.

 

Dates and Work Hours:

  • December 2023–February 2024
  • Monday through Friday, 7 a.m. – 6 p.m., excluding holidays

 

*Dates and times subject to change.

 

closure map

 

For additional information about the Landside Access Modernization Program, visit FlyLAX.com/ConnectingLAX.

Footer

Back To Top