LAX TERMINAL 1.5
The project proposes the construction of a new building located between Terminals 1 and 2. The new facility will ease congestion and provide connectivity between the two terminals – both within the ticketing and check in portion as well as post-security screening. LAX Terminal 1.5’s post-security airside pedestrian connection means passengers connecting between the two terminals will no longer have to leave the secure area of the concourse, exit the building, and go through security again to make a connection. LAX Terminal 1.5 plays an integral role in LAWA’s efforts to modernize the north terminals.
Elements of the Project
Additional space for passenger ticketing and baggage check-in
Additional security screening
Additional baggage claiming functionality in support of existing operations within the north terminals
A secure passenger connection
Office and support space
Project Objectives
The LAX Terminal 1.5 project will:
Enhance passenger level of service and satisfaction in the north terminals
Provide additional space for federal security requirements
Provide a secure connector between Terminal 1 and Terminal 2 to allow passengers to flow between terminals with no requirement for passengers to repeat the security screening process
Provide an uninterrupted link between the ticketing and baggage claim lobbies of both Terminals 1 and 2, improving the passenger experience and providing operational flexibility and efficiency for the airport and airlines
LAX Plan Compliance Review Process:
Prior to issuing any grading, building or use of land permit on the a proposed Project, the Los Angeles City Council must grant an LAX Plan Compliance approval pursuant to the LAX Specific Plan. This approval will be based on recommendations from LAWA’s Executive Director and the Board of Airport Commissioners. The Executive Director’s recommendation will be included in the Executive Director’s Report.
Executive Director's Report (EDR) [+]
LAX T1.5 EDR - Main Document - PDF Download
Attachment 1 - Project Description - PDF Download
Attachment 2 - Site Plan - PDF Download
Attachment 3 - Final Initial Study/Mitigated Negative Declaration; MMRP see Environmental Documents Section of webpage (below)
Attachment 4 - Stakeholder Liaison's Report - PDF Download
Attachment 5 - LAX Traffic Generation Report - PDF Download
Attachment 6 - Aviation Activity Report - PDF Download
Attachment 7 - LA BOE Response - PDF Download
Attachment 8 - Transmittal Letters - PDF Download
Environmental Documents
California Environmental Quality Act (CEQA)
Notice of Intent to Adopt a Mitigated Negative Declaration/LAX Plan Compliance Review
Final Mitigated Negative Declaration (MND) [+]
Final Mitigated Negative Declaration - PDF Download
Final Initial Study – Mitigated Negative Declaration Main Document - PDF Download
Appendix A – Air Quality and Greenhouse Gas Technical Information- PDF Download
Appendix A-1 – Air Quality and Greenhouse Gas Calculations
Appendix A-2 – Comparison of Emissions from On-Site Rock Crushing and Off-Site Hauling
Appendix A-3 – Construction Related Emissions with Implementation of Standard Control Measures
Appendix B – Historic Resources Report - PDF Download
Appendix C – Construction Traffic Report - PDF Download
Appendix D – Initial Study-Proposed MND Mailing List - PDF Download
Appendix E – Comment Letters on the Initial Study-MND - PDF Download
Mitigation Monitoring and Reporting Program (MMRP) - PDF Download