LINXS Construction Advisory


WORK AT AIRPORT POLICE FACILITY REACHES UPPER FLOORS

Footer

Activity:
The headquarters building and parking structure of the LAX Airport Police Facility are going vertical. Work over the next several months will include building the second and third levels of the headquarters building, and the second, third, and fourth levels of the parking structure, as well as the installation of interior building mechanical, electrical, and plumbing systems for both buildings. The work is being managed and performed by Hensel Phelps and its subcontractors.


Dates:
May – June 2020


WORK HOURS:
Monday through Friday, 7 a.m. – 6 p.m.
Saturday, 8 a.m. – 5 p.m.
No Sunday or holiday work
Construction schedules are subject to change.


WHERE:
The future site of the LAX Airport Police Facility located at the northeast corner of Westchester Parkway and Loyola Boulevard.

WORK DESCRIPTION:
Construction crews will be forming, placing rebar, and pouring concrete for slabs on grade, columns, and walls for the headquarters building and parking structure. Inside plumbing, electrical, and communications infrastructure are included in the work. Activities will include the use of:

  • Excavators
  • Compaction rollers
  • Front end loaders
  • Back hoe loaders
  • Fork lifts
  • Dump/haul trucks
  • Concrete trucks
  • Concrete pump trucks

ADVISORIES/MITIGATION MEASURES:

  • Dust control
  • Use of watering trucks and street sweepers
  • Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan compliance
  • Noise will be monitored to be sure that work performed is within compliance
  • The public is not allowed to enter the construction work zone

TRAFFIC IMPACTS:
Trucks used to haul away debris will occasionally interrupt traffic as they enter and exit the site; however, traffic control measures will be used to safely direct drivers to minimize traffic disruptions. Please obey all posted parking restriction signs and construction signs.