Vacuum Separators, wrapped in protective coverings prior to installation, at the Quick Turn Around
(QTA) Building of the Consolidated Rent-A-Car Facility.
A view from the Consolidated Rent-A-Car Facility Quick Turn Around (QTA) Building roof at the
foundations for the Idle Storage (IS) Building.
A view from the Ready Return (RR) Building Level 3 at the Consolidated Rent-A-Car (ConRAC) Facility
looking at the Idle Storage (IS) Building foundations.
Rebar column cages on the Level 3 of the Consolidated Rent-A-Car (ConRAC) Facility Ready Return (RR)
Building with a view of Level 4 in the background.
Support columns for the Automated People Mover (APM) where it will eventually connect to the
Consolidated Rent-A-Car Facility.
First day at the Consolidated Rent-A-Car (ConRAC) Facility Ready Return (RR) Building Level 4 with
the installations of beam cages and deck rough-ins.
Electricians and iron workers fine tuning the conduits and rebar for the deck the day before a Level
4 deck pour at the Consolidated Rent-A-Car (ConRAC) Facility Ready Return (RR) Building.
Workers are completing the deck final finishing post pour on the roof level of the Consolidated
Rent-A-Car Facility Quick Turn Around (QTA) Building.
Concrete is placed inside the future Maintenance and Storage facility for the second level floor.
APM guideway columns are constructed where the system will interface with the future Consolidated Rent-A-Car facility.
Station construction continues at the future Intermodal Transportation Facility-East.
The erection of falsework where the APM guideway approaches Airport Boulevard precedes the construction of formwork and concrete placement.
Workers perform maintenance on a crane used to lift construction materials onto the APM guideway falsework.
Crews construct formwork out of lumber and steel in preparation for guideway concrete placement at the future East Central Terminal Area station.
Falsework steel delineates the path of the APM guideway as it moves through the LAX Central Terminal Area.
Construction of the future Center Central Terminal Area station continues to advances within view of the iconic LAX Theme Building.
Workers place concrete for the foundation of the future West Central Terminal Area station.
A plane on approach to LAX passes by the Intermodal Transportation Facility-West.
An exterior view of the Intermodal Transportation Facility-West.
A view of the LADWP power facility at the Intermodal Transportation Facility-West.
Escalators arriving for future installation at the Intermodal Transportation Facility-West.
Stairs being installed at the Intermodal Transportation Facility-West.
Construction of the cantilever walkway on the south side of the Intermodal Transportation Facility-West, which will eventually connect to the Automated People Mover station via pedestrian bridges.
A view of the cantilever walkway on the south side of the Intermodal Transportation Facility-West, which will eventually connect to the Automated People Mover station via pedestrian bridges.
A plane flying over the roof of the Intermodal Transportation Facility-West.
Security bollards being installed on the ground level of the Intermodal Transportation Facility-West.