Construction continues on the APM guideway segment that will service the future West CTA station.
Crews construct the concrete support structure for the future Center CTA station.
Ironworkers install reinforcement bar prior to concrete placement.
Once complete, the APM guideway will pass by the iconic LAX Theme Building.
As construction of the APM guideway advances, formwork is constructed atop a falsework platform, into which concrete will eventually be placed.
The interior buildout of the future Maintenance Storage Facility continues with ductwork.
At the future Maintenance and Storage Facility, concrete pours for the system's only at-grade tracks are now complete, with the installation of guiding elements to follow.
Just west of the future Intermodal Transportation Facility-West station, formwork has been stripped revealing the first segment of completed guideway superstructure.
Machinery used to spread concrete is installed on rails prior to the final concrete placement for the guideway superstructure.
APM guideway construction advances across the 96th Street roadway as it approaches Century Boulevard.
Workers use blow torches to break apart the pedestrian bridge connecting Terminal 3 to Parking Structure 3
The pedestrian bridge connecting Terminal 3 and Parking Structure 3 being removed.
The first floor of the Intermodal Transportation Facility-West and escalators waiting to be installed.
The exterior façade of the Intermodal Transportation Facility-West.
A view of the cantilever walkway on the south side of the Intermodal Transportation Facility-West, which will connect to the pedestrian bridge for the Automated People Mover station in the future.
Overhead electrical and fire suppression system in the basement of the Quick Turn Around (QTA) building at the Consolidated Rent-A-Car (ConRAC) facility.
Vertical shear wall and columns at the Quick Turn Around (QTA) building at the Consolidated Rent-A-Car (ConRAC) facility.
Concrete Masonry Unit (CMU) of stairwell at the Quick Turn Around (QTA) building of the Consolidated Rent-A-Car (ConRAC) facility.
A concrete pour along with excavation for fuel tank installation are taking place simultaneously at Quick Turn Around (QTA) building of the Consolidated Rent-A-Car (ConRAC) facility.
Excavating trenches for the installation of the storm drain line on the westside of the Ready Return (RR) building at the Consolidated Rent-A-Car (ConRAC) facility.
Iron workers in the process of installing bottom mat on Level 3 of the Ready Return (RR) building at the Consolidated Rent-A-Car (ConRAC) facility.
Support posts for the Solar Arrays that will be mounted on the roof of the Quick Turn Around (QTA) building at the Consolidated Rent-A-Car (ConRAC) facility.